Then connect the cable clamp plate and aluminum spacers to your brackets with locknuts. These needs to be tightened to the required torque of 5 ft.-lbs. or cosy as well as a fifty percent transform. Loop the excess cable up and hold it in place with zip ties. The Aladdin Storage https://simonovcjp.wikiexcerpt.com/3521882/the_2_minute_rule_for_attic_lift_systems