Now there are plenty of floor loaded gates at this spot which were being produced back in 2018 for United's temporary regional operations when a brand new and extra regional wing was being built on to the east end of Concourse B. The new United Concourse B regional wing opened https://den86420.tokka-blog.com/27021907/a-review-of-cursus